Watsia Gas Plant
Location: Dongara, WA
The Waitsia Gas Stage 2 Project, owned by Mitsui E&P Australia (MEPAU), is a major onshore LNG processing facility located 18km southeast of Dongara WA. As part of the project’s development, Clough, the main contractor, required several critical structures to support the operational needs of the gas plant.
Rollwell Engineering was successfully awarded the design and construction of multiple key facilities, including:
- Five Chemical Shelters
- Condensate Loadout Shed
- Workshop – featuring a mezzanine floor, office partitioning, and a 5-tonne overhead crane
To ensure seamless execution, Rollwell Engineering collaborated with FEC for engineering design and certification and Future Power for electrical design, supply, and installation.
This turnkey project stands as a testament to Rollwell Engineering’s expertise, efficiency, and ability to deliver complex infrastructure. It highlights how well our group of companies integrates to achieve outstanding results, reinforcing our reputation as a trusted leader in engineering and construction.
HAVE A PROJECT IN MIND?
Contact us to discuss.




